Login | My Profile
View Project lists / Carts
English | Deutsch | Français | Italiano
Home   |    Site Map   |    Locations Worldwide   |   International Projects   |   Lineg   |    info@belimo.ch

Go
Fail-Safe Solutions  |  Energy efficiency  |  Download Center  |  Phased out products  |  Solutions & Applications  |  References  |  Interesting Links

General Air Solutions
Safety Solutions
Room & System Solutions
(incl. VAV and CAV)
Water Solutions
Bus & System Integration
Retrofit
Products A to Z
Send PDF data sheets

Get product brochures:
- in PDF format
Contact us!

E-mail Alerts

Sign up




The Olympic Hall, Ano Liossia

Installed Belimo products:

100 pcs globe valves
80 pcs damper actuators




The Olympic Hall, Galatsi

Installed Belimo products:

130 pcs globe valves
250 pcs damper actuators




The Goudi Olympic Complex

Installed Belimo products:

50 pcs globe valves
70 pcs damper actuators




Kaftanzoglio Stadium, Thessaloniki

Installed Belimo products:

150 pcs ball valves
30 pcs globe valves
200 pcs damper actuators




The Olympic Canoe/Kayak Slalom Centre

Installed Belimo products:

32 pcs ball valves
100 pcs damper actuators




The Olympic Tennis Centre

Installed Belimo products:

50 pcs globe valves
150 pcs damper actuators






The Athens Olympic Village

Installed Belimo products:

4500 pcs ball valves
550 pcs damper actuators
120 pcs globe valves




The Panthessaliko Stadium, Volos

Installed Belimo products:

100 pcs globe valves
250 pcs damper actuators




Indoor Hall, Peristeri

Installed Belimo products:

80 pcs globe valves
120 pcs actuators


[Copyright (c)2010 BELIMO Automation AG. All rights reserved. ]